Abstract: The construction sector in India is one of the most important contributors to the country's economic growth and development. With low production costs and the planned performance of the construction industry in India, there are two major challenges limiting the development of this sector in the country. The project includes construction As a result, in this the purpose of this study is to fill in a critical information gap. By identifying various factors that cause construction problems and using them as a starting point, we consider the construction of objects, housing construction. Provided are the results of a survey that was conducted on the relative importance of entrepreneurs and consultants that were determined using the Relative Importance Index. (RII). The results showed that there were no products on the site, as well as unexpectedtechnical conditions. Weather conditions, lack of planning, procurement, not getting the facility, conditions, lack of modern equipment, staff training by inadequate working conditions, equipment failure, contractors and consultants were identified asthe main reasons for project delays in India. It is assumed that the construction of the most advanced line of players who focus their attention on the important variables that have been discovered, and their level of environmental impact, have been quantified, with the result that it may be that among the contributing factors occurred in the housing sector, India: a significant reduction or control that will eventually lead to the completion of the project on schedule.Keywords — Planning, Project Delays